Format WP4- Cost benefits analysis- Deliverable report D15 - Calibration and validation of the integrated CBA model
BRILLET ; LEPERT
Type de document
RAPPORT DE RECHERCHE
Langue
anglais
Auteur
BRILLET ; LEPERT
Résumé / Abstract
This report holds for the fifteenth of the sixteen deliverable Reports that are to be produced as part of the FORMAT project (Fully Optimised Road Maintenance). Its purpose is to present the results of some applications of the integrated prototype spreadsheet described in the D 10 report, plus some related items. This report was produced as part of Work Package 4 WP4 "Costs Benefits Analysis" of the FORMAT project., RAPPORT D'ETAPE